A few updates as of today:
They're painting the interior side of the north roof track, presumably to prepare it for the light installation.
On the east side (on the ground), you can see 3 pieces of the light assembly that will go on the edge of the stationary roof (you can see on the right side they're installing the supports that will hold the lights)
They're painting the interior side of the north roof track, presumably to prepare it for the light installation.
On the east side (on the ground), you can see 3 pieces of the light assembly that will go on the edge of the stationary roof (you can see on the right side they're installing the supports that will hold the lights)