Homeplate entrance at the corner of 6th and 16th
This location in December 2009.
This spot in June 2009.
This spot in March 2008.
West side of the stadium (Plaza/First Base Entrance)
This location in December 2009.
This location in June 2009.
This spot in March 2008.
South side (Rightfield)
This location just last month.
This location in December 2009.
Centerfield looking in at the first base grandstands.
This location just last month.
Centerfield entrance
This location in January 2010.
This location in June 2009.
East side (Leftfield)
This location in January 2010.
This location in December 2010.
That corner will eventually look like this.
Construction slowly wraps around the rightfield corner (December 2009)
Northwest corner (Leftfield corner)
Construction is advancing on the third base grandstands (North side)
Scaffolding slowly coming down and revealing the roof supports.
Just four months ago these columns were barely 60 feet tall.
Super columns in September 2009.
This location last month.
Last month.
Got to wonder how much longer this day care will be at this location.