Highlights:
-Ballpark is on budget and in some cases additional savings have been identified
LEED Silver Certification:
-Ballpark on track for LEED Silver certification (first retractable roof ballpark in the country to do so)
-Roof of parking garages will have solar panels
-Panels will create 23% in energy savings (15% needed for LEED Silver)
-Water use reduction is 30% and will exceed 40% for the project
Ballpark Art:
-$7.5 million budget
-432 artists submitted proposals for ballpark art
-31 proposals from 18 artists selected by a Professional Advisory Committee
Preview of the view from the club level looking to leftfield and the skyline:
Report: http://www.miamidade.gov/ballpark/li...nstruction.pdf
-Ballpark is on budget and in some cases additional savings have been identified
LEED Silver Certification:
-Ballpark on track for LEED Silver certification (first retractable roof ballpark in the country to do so)
-Roof of parking garages will have solar panels
-Panels will create 23% in energy savings (15% needed for LEED Silver)
-Water use reduction is 30% and will exceed 40% for the project
Ballpark Art:
-$7.5 million budget
-432 artists submitted proposals for ballpark art
-31 proposals from 18 artists selected by a Professional Advisory Committee
Preview of the view from the club level looking to leftfield and the skyline:
Report: http://www.miamidade.gov/ballpark/li...nstruction.pdf
Comment