    View of the window in leftfield as you approach it it on NW 5th Street.


    Closer look at the window. The left side of the picture will be the centerfield gate.


    Scoreboard structure (in white) already in place.


    A look at some of the complexity of the the stationary and retractable portions of the roof.


    Southeast corner (Centerfield) of the stadium on the corner of 3rd and 14th.


    Southwest corner (Rightfield corner) of the stadium on the corner of 3rd and 16th. Grading has not been completed on the future location of the south parking garages.


    Northwest corner of the ballpark (homeplate) at 6th and 16th.


    Homeplate gate.


    West side of the ballpark (first base side) parallel to NW 16th Avenue. This picture does not look any different from the picture in September. However, in September the first panel of the roof was being completed. In November, the second of three panels is being completed.


    A peak of the ballpark between the NE and NW parking garages.


    Outer walls of the NE parking garage being erected.




    The facade of the the parking garages has these ornamental elements on the corners and under the 'windows'.


    This new storm drain shows the new streets on the south side of the stadium will be 6 inches higher than the current. This neighborhood is one of the oldest in the city and the terrain was not leveled like 99% of South Florida.